PGP Expansion – Abu Dhabi (2021)

Client:

G42

Project Scope:

As part of the Population Genome Program (PGP) Expansion, Be Quick Electromechanical played a crucial role in executing the MEP works for a high-tech genetic laboratory in Abu Dhabi. This facility required precision engineering, temperature-controlled environments, and high-tech infrastructure to support advanced genetic research.

Key Deliverables:

πŸ”Ή HVAC & Clean Room Environment – Installation of high-efficiency air filtration and climate control systems to meet strict laboratory standards.
πŸ”Ή Electrical & Data Infrastructure – Uninterrupted power supply (UPS), high-voltage distribution, and structured cabling to support lab equipment and data centers.
πŸ”Ή Plumbing & Special Drainage – Chemical-resistant drainage systems and deionized water supply for laboratory use.
πŸ”Ή Fire Suppression & Safety – Integration of gas-based fire suppression systems (FM200) to protect sensitive equipment.

Challenges & Solutions:

  1. Strict Environmental Control – Installed HEPA filtration and humidity control systems to maintain a stable research environment.
  2. Energy Efficiency & Redundancy – Designed a dual-power backup system to ensure uninterrupted operations.
  3. Compliance with Research Standards – Executed the project while adhering to international laboratory safety regulations.

Project Value:

πŸ“Œ AED 2,498,458.00

This project reflects our expertise in executing high-tech laboratory MEP solutions, ensuring precision, safety, and efficiency.

Leave a Reply

Your email address will not be published. Required fields are marked *

Contact

Copyright Β© 2025 BeQuick, created by PixalMedia