Client:
Khalifa University
Project Scope:
Be Quick Electromechanical was awarded the MEP execution and redesign for the Arzanah Building at Khalifa University, converting existing classrooms into advanced research laboratories. This project required high-precision environmental control, specialized plumbing, and electrical infrastructure to support scientific research and experimentation.
Key Deliverables:
πΉ HVAC & Cleanroom Environment β Installation of temperature and humidity-controlled ventilation systems, ensuring lab sterility and compliance with research standards.
πΉ Electrical & Low Voltage Systems β Implementation of uninterrupted power supply (UPS), structured cabling, and automation systems to support high-tech laboratory equipment.
πΉ Specialized Plumbing & Drainage β Integration of chemical-resistant piping, deionized water supply, and waste neutralization systems for safe disposal of laboratory chemicals.
πΉ Fire Safety & Suppression Systems β Deployment of gas-based fire suppression (FM200), emergency lighting, and advanced alarm systems to meet strict safety regulations.
Challenges & Solutions:
- Retrofitting an Existing Educational Space β Successfully redesigned and upgraded the MEP systems to meet the new functional requirements without disrupting university operations.
- Precision Environmental Control β Installed HEPA filtration and airflow balancing systems to maintain contamination-free conditions.
- Compliance with Laboratory Standards β Ensured all systems met international research and university safety guidelines while adhering to a tight project timeline.
Project Value:
π AED 3,000,000.00
This project showcases our ability to transform academic spaces into state-of-the-art research laboratories, ensuring cutting-edge infrastructure, safety, and compliance for advanced scientific exploration.