Client:
G42 Healthcare
Project Scope:
Be Quick Electromechanical was entrusted with the full MEP execution for a cutting-edge research and diagnostics laboratory in Masdar City, Abu Dhabi. This high-tech facility required precision environmental control, advanced electrical infrastructure, and specialized plumbing systems to support biomedical research and testing operations.
Key Deliverables:
πΉ HVAC & Climate Control β Installation of HEPA filtration, humidity control, and pressurized cleanroom environments to maintain the labβs stringent air quality requirements.
πΉ Electrical & Backup Systems β Design and implementation of a redundant power supply, structured cabling, and smart automation to support continuous research operations.
πΉ Specialized Plumbing & Drainage β Integration of chemical-resistant piping, deionized water systems, and neutralization tanks for laboratory waste management.
πΉ Fire Suppression & Safety β Deployment of gas-based fire suppression (FM200), emergency lighting, and alarm systems for enhanced safety compliance.
Challenges & Solutions:
- Precision Environmental Control β Implemented zoned temperature and humidity regulation to accommodate different research processes.
- 24/7 Uninterrupted Power Supply β Installed dual power sources and UPS systems to protect sensitive lab equipment from power failures.
- Sustainability & Energy Efficiency β Designed low-energy HVAC and lighting systems in alignment with Masdar Cityβs sustainable building standards.
Project Value:
π AED 3,500,000.00
This project showcases our expertise in delivering highly specialized MEP solutions for research and medical laboratories, ensuring precision, safety, and energy efficiency in a world-class innovation hub.